There
are three types of asbestos survey and all serve different purposes. It
is possible to mix the different types of survey and the options will
usually be discussed fully prior to commencing the surveying project.
Type
1 Asbestos Survey
Location & Assessment (Presumptive) Survey
The
aim of the type 1 asbestos survey is to locate the presence and extent
of any suspect asbestos containing materials (ACMs) in the building
and to assess their condition.
The
surveyor(s) will look closely at each aspect of the building with a
view to identifying materials suspected as containing asbestos.
Because
asbestos was used in such a wide range of building, insulation &
fire-protective materials, they can crop in the most unexpected places.
Refurbishment
carried out in the past might be hiding other surfaces that contain
asbestos and for this reason, the surveyor will need to look into suspended
ceiling voids, behind doors and into service risers.
If
the surveyor cannot access these areas, the area will be presumed to
contained asbestos.
Also,
if it cannot be conclusively proven that certain materials do not contain
asbestos, then they too will be presumed to contain asbestos.
All
such materials need to be logged and their condition has to be assessed.
It
is only possible to confirm or refute the presumption that a material
contains asbestos by taking a small sample at or shortly after the time
of the survey.
As
a type 1 survey does not involve taking samples, you might wish to discuss
the option of combining a type and type 2 survey before commencement
of the exercise.
Type
2 Asbestos Surveys
Standard Sampling Identification and Assessment Survey
The
type 2 asbestos survey is the same as a type 1 except that the surveyor
will take samples of all suspected materials with a view to positively
identifying that they contain asbestos.
The
samples are taken by experienced asbestos surveyors, but depending on
the location and types of asbestos, it might be necessary for the survey
to be carried out outside of normal business hours to reduce the risk
to your workforce.
Once
taken, the samples are sealed into safe containers and transported to
an independent asbestos analysis laboratory for microscopic examination.
The
results of the sampling will be included in the surveyors report.
If
asbestos is found to be in a poor condition that could present a danger
to health, the surveyor will have to suspend the survey until a repair
has been made to the material, or in severe cases, it has been removed.
Type
3 Asbestos Survey
Pre-Demolition / Major Refurbishment Survey
This
type of survey is required prior to any major refurbishment works or
when a building is to be demolished.
A
full sampling programme is undertaken to identify the types of asbestos
present in the building and also to calculate approximate volumes of
materials involved.
This
type of survey is particularly useful for the basis of tendering for
the removal of ACMs from the building and as such, the survey does not
assess the condition of the materials.
AsbestosSurveys.com
is able to project manage asbestos removal contracts and liaise with
the contractors on your behalf.
If
required, we are also able to prepare tender documents and manage the
tendering process for ther removal of asbestos on your behalf.
Please
see the Asbestos Removal page for more information.

©
AsbestosSurveys.com - Asbestos Survey Types